On Friday 8th the kitchen was installed. I spoke to Wayne today and he told me one of the cabinets got delivered but not installed because it was stolen. I didn't notice because I didn't realise there was one going in above the exhaust fan. I had to look at the plans. The tiler did the screed on Saturday and starting tiling on Monday. He will be finished laying the tiles today and will do the grout tomorrow. I asked for a rough completion date and I was told mid June. So it only about a week behind the 17 weeks. Time for some photos.
Boys bathroom, The bath will be tiles the same as the floor
Ensuite floor tiles
Ensuite again with sink/cabinet
The front tiled. That is also the same as the main floor tile
Kitchen cupboards with the missing cabinet
You can see the colour of the bench tops abit
The laundry tiles, they are grey but they look abit brown in the photos
Boys bathroom again with sink/cupboard
My walk in pantry
Missing kitchen cupboard replaced and splash back done
Don't know if i like this yet, It just looks abit out of place
The boys bath with the white tiles, I wanted them the same as the floor but the lady at the tile shop didn't write it down. We will keep it white though.